ABOUT 關於耕芯

SCROLL DOWN
「耕」一方空間Cultivating spaces.
GENGXIN DESIGN
築一處「芯」之所向Creating places that resonate from within.
耕芯空間制作

Company Profile

公司簡介

新屋舊邸、商業場所、預售屋客變,耕芯皆由「傾聽」起始,只為掌握使用者所想所需,細膩勾勒客製化的場域藍圖,打造貼合顧客品味、功能需求的獨到境域。

From new residences and existing homes to commercial spaces and pre-sale home customization, every Geng Xin project begins with “listening,” with the aim of understanding what each client truly wants and needs, thoughtfully shaping a customized blueprint for each space, to create distinctive spaces tailored to each client’s taste and functional needs.

設計理念

設計理念

Design Concept

我們認為出色的設計,源自場景和人之間的緊密連結,將空間主人的人生故事,透過材質、色彩、光影堆疊的視覺張力,融入軟硬裝的諧和比例中,進而創造獨一無二的豐富畫面層次。

We believe exceptional design grows from the close connection between people and space, translating each client’s life story through the visual interplay of materials, colors, light, and shadow, and weaving it into a harmonious balance of architectural elements and furnishings, thereby creating rich and distinctive layers unique to every space.

共築理想生活

從溝通中理解需求與對未來生活的想像,並透過設計與專業協作,將抽象構想逐步落實,讓設計真正融入生活,打造兼具質感與舒適的理想空間。

Through thoughtful communication, we understand each client’s needs and vision for the future, transforming ideas into reality through design and professional collaboration, allowing design to become a natural part of everyday life and creating an ideal space defined by quality and comfort.

耕芯空間制作室內設計|客廳電視牆與拱門 耕芯空間制作室內設計|吧檯與木作天花
方思閔

Design Director

設計總監

方思閔Fang, Si-Min

Award Record

得獎紀錄
  • 2026 美國 Muse Design Awards《沐光安序》- Silver Winner